English:Operations procurement quality and customer service - Business Year 10

Aus MOOCsWiki Staging
aiMOOC-Siegel aiMOOC

Operations procurement quality and customer service - Business Year 10

QR-Code



Introduction

North Bench is a fictional workshop making fabric pencil cases. It has promising orders, but its sewing table falls behind and some zips arrive late. Work out where delays start, compare two suppliers and propose a clear quality check and customer response.


Choose a production method that matches demand

Business operations turn inputs into goods or services. The pencil-case workshop uses fabric, zips, labour and tools. Its outputs include completed pencil cases and waste materials. The best way of organising production depends on variety, expected demand and how much the firm can spend.

Method Classroom example Practical trade-off
Job Make one custom case in a requested size Suits variation, with more time per item
Batch Make 30 of one design before switching fabric Shares setup time, with some stock waiting between stages
Flow Pass standard cases continuously through regularly organised stages Can achieve consistent volumes at high demand, with less flexibility

Start with batch production for a regular order of two standard designs. Make a single custom case as job production when a different zip or size is requested. A continuous flow line might need a different layout and sustained demand.

Fabric pencil case with a zip and sewn panels
A fabric pencil case illustrates features the workshop would need to assemble and inspect.

Written route: Identify three operations needed for a fabric case: prepare the pieces, join the material and fit the closure. Tell the difference between a product feature and a manufacturing operation.

Written route: Compare a one-off prototype, a batch of 30 and a regular stream of identical items. Give one benefit and one constraint for each.


Find the bottleneck and anticipate the next one

Each case passes through cutting, sewing, checking and packing. The table shows estimated daily capacities when each stage has enough inputs and there are no faults or downtime.

Stage Cases per day before training Cases per day after sewing training
Cut 48 48
Sew 30 45
Check 40 40
Pack 36 36

The bottleneck is the tightest stage in the sequence. First it is sewing, with a maximum steady output of 30 per day. After sewing rises to 45, packing limits output to 36 per day. The modelled output across five days changes from 150 to 180, not to 225. With a steady 35 new cases required per day, the original process is short by five per day. The adjusted process can cover the target under the model, with one daily case of spare capacity.

Sewing machine with fabric hanging over the work surface
A sewing station. Tools, staffing and process time can each affect its capacity.

Written route: If cutting continues at 48 while sewing can handle only 30, consider how much unfinished stock could build up. Pace upstream work to the bottleneck unless it serves another tracked purpose.


Select suppliers on more than price

Procurement is how a business selects and purchases what it needs. Logistics includes the movement, storage and delivery of supplies and outputs. The workshop compares two offers for 120 zips. Its figures are fictional.

Supplier Price per zip Delivery charge Quoted lead time Usable in a previous lot of 120 Previous deliveries on time
A £0.36 £7.80 8 days 115 9 of 12
B £0.41 £4.80 5 days 118 11 of 12

Supplier A's delivered price is 120 × £0.36 + £7.80 = £51. Supplier B's is £54. The recorded on-time proportions are 75% for A and about 92% for B. If the same usable counts recur, the delivered cost per usable zip is about 44 pence for A and 46 pence for B, rounded to the nearest penny. A future delivery need not match the earlier records.

For a time-sensitive order, buying a more expensive input may reduce delays. For a flexible order, the lower-cost supplier might be suitable if quality meets the requirement. Check remaining stock, test sample zips and agree what happens if a delivery is incomplete. If stock is held as a buffer, it protects against delays but takes space and ties up money.


Prevent problems and detect faults

Quality assurance designs checks into the process so that expected standards can be achieved consistently. Quality control checks a product or sample against those standards and identifies faults. For example, agree a consistent zip position and train staff to use the same guide. Then verify the position and test operation of the zip on finished cases.

Observation Before the guide After the guide
Cases checked 120 120
Zip faults found 7 3

The observed rate went from about 5.8% to 2.5%. A lower rate in two groups of this size is encouraging, but differing batches, staff or zip types could help explain it. Repeat the same checks across several batches and record what changed before crediting the guide with the difference.

Written route: Sort these actions into prevention and detection: train staff to use a guide, test a finished zip, agree a measurement tolerance, and log a seam fault discovered in inspection.


Respond to customers and use their feedback

Suppose a school ordered 35 cases for Friday. A supplier delay means only 30 can be completed by then. Confirm the figures, contact the school before the deadline, explain the shortfall and offer realistic options such as sending 30 on Friday and agreeing when the remaining five can follow. Record what the customer chooses, who will act and when the next update is due.

Separate complaint counts from performance rates. If 95 of 100 packages leave on time one month and 114 of 120 the next, the on-time rate stays at 95% even though the later month handles 19 more on-time packages. Report both the rate and its denominator. Track repeat faults so procurement and production staff learn from complaints.

For a new process, suppose printing can handle 60 labels per hour, cutting 45 and packing 50. Cutting is the bottleneck. If training takes cutting to 52, packing becomes the bottleneck at 50 per hour. Suggest a suitable quality check and one question for a label customer.


Interactive Tasks


Quiz: Test Your Knowledge

Which production method suits a single case made to a requested size? (Job) (!Batch) (!Flow) (!Continuous extraction)



What initially limits the modelled workshop output? (Sewing) (!Cutting) (!Packing) (!Inspection)



What limits daily output after sewing training? (Packing at 36) (!Sewing at 45) (!Cutting at 48) (!Checking at 40)



What is the modelled five-day output after training? (180 cases) (!225 cases) (!200 cases) (!150 cases)



What is the delivered price of Supplier B's lot? (£54) (!£49.20) (!£51) (!£56)



Which supplier had the higher observed on-time rate? (Supplier B with 11 of 12) (!Supplier A with 9 of 12) (!Both reached exactly 100%) (!Both reached exactly 75%)



Which action is an example of quality assurance? (Train staff to use the same zip positioning guide) (!Count faulty cases after a batch is finished) (!File a complaint after a missed delivery) (!Ignore the variation in zip position)



What was the observed post-guide fault rate? (2.5%) (!5.8%) (!3%) (!7%)



What is the recommended first response to an expected shortfall for the school? (Tell the customer early and agree realistic options) (!Wait until the scheduled delivery has passed) (!Promise all units without checking capacity) (!Remove a case from the order without notice)



What is the final hourly capacity of the label process after cutting improves? (50) (!45) (!52) (!60)





Memory Game

Original bottleneck Sewing at 30 per day
New bottleneck Packing at 36 per day
Supplier A delivered lot cost £51
Supplier B quoted lead time 5 days
Fault count following the guide 3 out of 120





Drag and Drop

Train staff to use a zip positioning guide Quality assurance
Test the zip on a finished case Quality control
Collect promised delivery dates and quotes Supplier comparison
Hold a small reserve of zips Buffer stock
Notify the school early of a late part-order Customer communication





Crossword Puzzle

CAPACITY Maximum output possible over a period under stated conditions
BATCH A group of matching items made together
LOGISTICS Organising movement, storage and delivery
SUPPLIER A business providing another business with an input
STANDARD A requirement against which a product can be checked
DEFECT A fault or failure to meet an expected requirement





LearningApps

Optional extra practice. Choose an appropriate activity with your teacher. If the external collection is unavailable, use the native activities and independent tasks in this course.


Cloze Text

Complete the explanation.
A one-off order often uses

production. Making groups of the same item is

production. The slowest stage is a

. Purchasing inputs is

. Moving and storing goods involves

. A final inspection is an example of quality

.



Open Tasks


Easy

  1. Identify an input: Name one physical input and one resource used to make the cases.
  2. Read the table: Which stage can check 40 per day?
  3. Read a lead time: Which supplier quoted five days?
  4. Identify a check: Describe one check for a finished zip.


Standard

  1. Find the limiting process: Show the maximum steady output before and after sewing training over five days.
  2. Calculate the lot costs: Use prices and delivery charges to calculate both totals.
  3. Compare two rates: Calculate the two observed zip fault percentages.
  4. Write a customer update: Draft a short factual update telling the school what can be delivered and when the rest will be confirmed.


Advanced

  1. Choose a supplier under uncertainty: Compare the lot costs, lead times and historic performance before recommending one option for an urgent job.
  2. Investigate a quality improvement: Plan how to test whether the guide is associated with fewer faults while keeping the comparison fair.
  3. Transfer the bottleneck method: Update the hourly label process after cutting training and explain why the output does not reach 52.
  4. Evaluate service performance: Explain why 19 more on-time packages does not imply the on-time rate increased.



Learning Check

  1. Find capacity: Explain the original and revised daily bottlenecks using the table.
  2. Recompute supplier prices: Calculate both delivered prices and the difference.
  3. Review the fault data: Calculate the before and after rates to one decimal place and note a limitation.
  4. Apply quality management: Give one assurance action and one control action for fabric cases.
  5. Compare customer service rates: Calculate the on-time rates for 95 out of 100 and 114 out of 120 and report the result clearly.


Worked checks and assessment guidance

  1. The smallest daily capacity is originally 30 at sewing. After sewing increases to 45, the smallest daily capacity is 36 at packing.
  2. Supplier A costs £43.20 plus £7.80, or £51. Supplier B costs £49.20 plus £4.80, or £54. B costs £3 more for the lot.
  3. The rates are 5.8% and 2.5%. Other changes in the batches or staff could affect the result, so compare further batches.
  4. Assurance: specify a guide for zip position and train staff. Control: test the zip and measure its position against the tolerance.
  5. Both months are at 95%. The second handles more on-time packages but has the same proportion.


Learning evidence

Recommend a production method and supplier for a time-sensitive order. Include the throughput calculation, a trade-off for stock, one preventive measure and a short customer update for the 35-case order.


OER and Wikipedia

Department for Education, GCSE business subject content. AQA, business operations. Workshop figures and supplier histories are fictional.

Pencil case, attributed on Commons to Xjaja~commonswiki, public domain. Sewing machine, Jalamcy2023, CC BY-SA 4.0. Both photos are from Wikimedia Commons.

Methods of Production Explained and Quality Assurance and Quality Control Explained, Business Teacher T. Both have written routes.

iFrame blockiert

Diese externe Quelle ist für aiMOOC-iFrames nicht freigegeben.


Linked learning areas


aiMOOC Projects



Schulfach+




aiMOOCs



aiMOOC Projekte









MOOCwiki · Deutsch

Nach dem Lernen ist vor dem Lernen

Entdecke direkt den nächsten Lernkurs. Weitere Inhalte erscheinen, wenn Du weiter nach unten scrollst.

Zur MOOCwiki-Hauptseite

Mediathek

Suche verfeinern

Dein Lernplan bestimmt, was oben steht. Alle anderen Inhalte bleiben erreichbar. Seitenaufrufe beeinflussen die Auswahl nicht.

Inhalte werden geladen ...

Mediathek wird aus dem Wiki geladen ...